Home remodeling Ideas
Home Remodeling Pictures 9 Kitchen Pictures 9 Refacing After Pictures

[wpu_silo links=’10’]

Cabinet refacing – after pictures

Scroll down to Cabinet Pictures

Today, all of the work on the cabinetry refacing is complete and we couldn’t be more pleased. The cabinet drawers open and close with a fingers touch. Toady’s pictures show the drawers finished, and the crown molding around the ceiling in in place. The refrigerator and microwave are back in place so the space looks a lot more complete now. Things are starting to look a little normal again.

Now that the cabinet refacing is done, there’s a few days built into the schedule before the granite counter top is to be installed. This being a Friday, the granite and sink isn’t going to be installed until Wednesday. That means living out of boxes over the weekend and experiencing great episodes of anticipation of the completed project.

After the granite top gets installed on Wednesday, the plumber will be in the next day to install all the new kitchen appliances – dishwasher, disposal, sink, and oven. Once he’s done with that, this phase of the remodel project is complete, and we do a walk-through with the project lead. Then we start thinking about painting, lighting and flooring. But the main thing is that we will be able to move back into our newly remodeled kitchen finally.